The Energy Performance of Building Directive 2002 is a European Directive designed to reduce
carbon emissions and promote energy efficiency.
New air conditioning systems over 12 kW installed after January 2008 must be inspected within 5 years of being put into service.
CIBSE Technical Memorandum TM44 provides guidance on conducting an air conditioning inspection to satisfy the requirements of the Directive as expressed in the various regulations in the UK. The focus is on systems that use refrigerants to produce cooling.
First inspection of all existing air conditioning systems over 250 kW cooling capacity should have been completed by 4 January 2009.
First inspection of all existing air conditioning systems over 12 kW should have been completed by 4 January 2011.
New air conditioning systems over 12 kW installed after January 2008 must be inspected within 5 years of being put into service.
Request a Quick Quote
Simply fill in the form below and one of our experienced engineers will contact you to discuss your requirement.
Thanks for the quick quote information!
Need some help? No problem.
If you don’t have an up to date asset register or any other information don’t worry. As part of our service we can arrange to conduct a pre survey site and systems check.
The cost varies depending on the length of time it will take to complete the survey and report. This is dependent upon the size and complexity of the A/C systems installed and the premises. The more information you can supply at this stage the better. Please email us with your contact details and we should be able to give you a quotation after our first discussion.
Once the site survey is completed, we aim to provide you with draft reports and certificates for checking within 3 days for small to medium sites and 10 days for the much larger projects. We will always keep you advised of progress.
We can arrange a pre survey site visit to obtain the information we require in order to quote you accurately for your requirements. The cost of this would be absorbed within and not in addition to our TM44 charges.
In addition to possibly missing out on zero cost implementation -energy saving recommendations, you could be fined by Trading Standards per premises or per zone on a one off or roll over basis until you complete. In addition to this, you may not be able to gain accreditation or renew accreditation to bodies like the ISO without full EPBD compliance.
No – Whilst it is a mandatory requirement to have a valid TM44 issued, implementation of the energy savings recommendations suggested is not monitored.
We have our own team of highly experienced licensed engineer assessors throughout England, Wales, Scotland.
Quick Links
Get in touch
Telephone:
07468 587152
Email:
contact@armstrongenergyconsultants.co.uk
Armstrong Energy Consultants Limited
71 Elmhurst Drive
Hornchurch
Essex
RM11 1NZ
Newsletter
Sign up to our newsletter and receive the latest updates.
All Rights Reserved | Armstrong Energy Consultants